CONNECTION OF 132KV DC OHTL FOR RESIDENTIAL S/S AND PHOSPHATE S/S AT WAAD AL-SHAMAAL

Commissioned by the Saudi Electricity Company (SEC), this project involved connecting 132kV double-circuit overhead transmission lines (OHTL) for a residential substation and the Phosphate substation at Waad Al-Shamaal. With a total value of 154,585,427 SAR, the project was completed in 2016 to strengthen the transmission network and support the industrial expansion in northern Saudi Arabia.