Commissioned by the Saudi Electricity Company (SEC), this project included the construction of a 132/33/13.8kV substation (#8514) and a 132kV double-circuit overhead transmission line (OHTL) connection in Quwaiah. With a total cost of 98,300,000 SAR, the project was completed in 2017 to expand the regional power infrastructure and ensure reliable electricity supply.